Project Description and Highlights
Project consisted of detailed process and electrical design to modify existing chicken fat storage systems to allow for addition of lactic acid into process. A new tanker unload systems and local recirculation loops were installed at each site’s chicken fat storage tanks. Additionally, a hot water heating loop was installed to provide heating to maintain acceptable temperatures for dosing acid. Existing plant steam was used to heat the water loop. Acid dosing skids were installed at each site which involved building work for containment for new tote storage and skids. The Ohio site required a new room with containment built, and the North Carolina site required new curbed containment for acid system.
Ventura Engineering was responsible for detailed design and bid package documents including, demolition, architectural and structural, process, mechanical, HVAC, and electrical (power, instrumentation, control wiring). In addition, Ventura provided construction support, I/O checkout, commissioning, start-up and troubleshooting for all process systems.