Flex Product 4 Lines & BLDG Expansion
Pet Food Manufacturer
(2022/24)
Fort Smith, AR
Project Description and Highlights
Project consisted of building expansion to accommodate 4 additional pet food lines to an existing facility. Building expansion was 249,000 sq. ft. pet food manufacturing facility including 15,400 S.F amenities, 233,550 process space. Process space receiving docks for raw materials, freezer, rack storage, conditions space for dries material ingredients, cooler room for mixing and product processing. Filling area, sterilization area final packaging.. Complete detailed design for all required plant process utility systems. Engineering services consisted of detailed design including civil, architectural, structural, mechanical, process and electrical disciplines, and construction management. PLC programming for Ventura designed systems and integration between OEM vendors. Also included start-up assistance, validation and check-out for all process systems and utilities.
The entire facility was designed to sanitary construction standards including such items as custom designed tubular platform support structures and resinous flooring systems. Included were shipping/receiving docks, freezer for meat storage, cooler for mixing/processing systems and conditioned space for micro-ingredients as well as extensive process drainage system for internal rooms. The mixing and filling processes were designed for easy cleaning, including piggable process piping systems to minimize product waste. Ventura prepared design/build document for building design guidelines.
A 2,000 gallon per minute process cooling water system, including cooling towers, chillers, tankage and distribution system was provided for product cooling. High/Low pressure steam distribution system for product sterilization and other process uses, compressed air system, R/O water system, high pressure hot water system for cleaning were all included in the design.