Urea Unload Shed
The Scotts Miracle-Gro Company
(2022/2024)
Marysville, OH
Project Description and Highlights
The project consisted of the design, construction, start-up and commissioning of a 1,700 sq. ft. rail car unloading and transfer building on existing railroad lines. A gantry was installed above the existing facility roof to provide a covered path for material transfer from the new urea unload shed to the resin tower.
The process included a gravity unload system and material handling via screw conveyor and bucket elevator. Material was dropped through a screener and onto a belt conveyor to be delivered from the unload shed to the resin tower through the new gantry. Ventura was responsible for the design, specification, and selection of the equipment listed above and we provided design for all chute work in this building.
Ventura Engineering was responsible for detailed design and bid package documents including architectural, structural, process, mechanical, and electrical (power and controls). Civil engineering services were subcontracted with a local civil engineer. Building and zoning permitting was completed by Ventura Engineering. In addition, Ventura provided construction management services and will be providing start-up assistance, validation, and check-out support for all process systems and utilities.